Guest Room Re-paint and Closet Project (pt. 1)

We worked on the guest bedroom last spring as one of our first projects.  This winter we  decided to work on it again, add the Crown and Baseboards and work on the closet. This is the bedroom with the new paint color (Riviera Beach) and the crown and base boards.

Completed 001

One minor but important project that we had to complete was the access panel for the bathroom plumbing. Rather than closing up the space, we knew we wanted a way to make it always accessible. We considered a lot of options to keep it closed and settled on a Magnet.

Completed 002

Finally, our biggest project was the spare bedroom closet. The previous owner had already opened up the doorway but there were a few issues…

The closet floor before is part linoleum and part patched in drywall (where the door was opened up).

Pic 001

The ceiling was also a piece of work. This picture shows the remaining wall frame in the ceiling.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s


Follow

Get every new post delivered to your Inbox.